Technical Due Diligence and Technical Inspection for a 5 MWp PV Power Plant

The objectives of the assignment were:

  • Identification of technical risks and development of measures for limitation and mitigation of risks
  • Review of the status of relevant licences and permits required for the construction and operation of the project
  • Review of electric grid requirements and check of the power plant’s compliance
  • Inspection of the power plant
  • Technical controlling

The scope of work covered the following aspects:

  • Determination of expected annual energy yield
  • Review of licenses and permits
  • Technical design review
  • Review of grid connection
  • Support in negotiation of project contracts
  • Construction monitoring
  • Verification of production numbers
  • Regular inspections of power plant (annual)
  • Consultancy in repair and budget questions
  • Assistance in warranty and insurance claims
  • Support in operational and economical improvements
  • Regular reporting to owners / banks

Technical Due Diligence and Technical Inspection for a 5 MWp PV Power Plant

Country

Germany

Year of Mandate

2004

Year of Commisioning

2005

Key Technical Data

  • Total capacity: 5 MWp
  • PV technology: poly crystalline
  • Inverter manufacturer: SMA Solar Technology
  • Grid connection: 20 kV substation
Evergy Engineering GmbH » Miegersbach
Thorsten Nogge biker, working @evergy since 2004
Eines der ältesten Projekte ist Miegersbach (2005). Das war sehr innovativ damals – eine große Anlage. In extrem kurzer Zeit haben alle Beteiligten hochmotiviert daran gearbeitet und es perfekt umgesetzt.
One of the oldest projects is Miegersbach (2005). At the time it was really ground breaking – a big plant. Within a very short time everyone who was working on it was highly motivated and the project was completed perfectly.
meet Thorsten

filter
cases
by
download
track
record