PV Power Plant Penycae, UK

Technical Due Diligence and Technical Inspection for a 5 MWp PV Power Plant

The objectives of the assignment were:

  • Identification of technical risks and development of measures for limitation and mitigation of risks
  • Review of the status of relevant licences and permits required for the construction and operation of the project
  • Review of electric grid requirements and check of the power plant’s compliance
  • Inspection of the power plant

The scope of work covered the following aspects:

  • Evaluation of expected annual energy yield
  • Review of licenses and permits
  • Technical design review
  • Review of grid connection
  • Support in negotiation of project contracts
  • Inspection of power plant

Technical Due Diligence and Technical Inspection for a 5 MWp PV Power Plant

Country

UK

Year of Mandate

2015

Year of Commisioning

2016

Key Technical Data

  • Total capacity: 5 MWp
  • PV technology: poly crystalline
  • Inverter manufacturer: SMA Solar Technology
  • Grid connection: 11 kV substation
Evergy Engineering GmbH » Penycae
Tejas Kuber science buff, working @evergy since 2015
इंग्लंडमध्ये “पेनिके” हा एक चांगला प्रकल्प होता. तो आकारात फार मोठा न्हवता, परंतु मी सुरुवातीपासून प्रकल्पाचा प्रत्येक टप्प्यात साहबगही होतो, साइटवर देखील. मला संपूर्ण प्रक्रियेचे एक चांगले विहंगावलोकन मिळाले.
“Penycae” in England was a great project. It wasn’t huge in size, but I was involved from the start and actively supported it at every project stage, including on-site. I ended up getting a great overview of the entire process.