PV Plant
Talayuela

Evergy delivered a bankable Technical Due Diligence report prior to the construction of the Talayuela PV Plant and continued to support the client with lender’s technical advisory services during the construction phase. Since commissioning, Evergy has provided ongoing technical controlling services.

Talayuela is part of a Spanish PV portfolio of approximately 500 MWp, located in the Cáceres region (Extremadura). At the time of the mandate, the project was still under development. Part of the project was a newly erected large scale grid connection infrastructure at 400 kV voltage level to the grid of Red Eléctrica de Espana. Talayuela's connection infrastructure is shared with seven other PV plants with a total capacity of approx. 618 MWp.

The services of Evergy comprised in particular:

  • Lender's Technical Due Diligence
  • Support in negotiation of supply agreements (EPC PV, EPC grid)
  • Calculation of hourly production profile to determine PPA pre-defined hedge quantities
  • Construction supervision with regular site visits and detailed delay risk analysis
  • Technical inspections at acceptance (PAC and FAC)

Country

Spain

Year of Mandate

2018

Key Technical Data

  • 300 MWp, single-axis trackers

Services

Energy Forecasts

Optimisation of Existing Projects

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Talayuela
Federico Ceriani musicophile, working @evergy since 2008
Da un impianto solare in Italia ad una centrale idroelettrica in Scozia: le sfide possono contribuire ad interessanti risultati e generare nuove idee. Sono aperto per ogni tipo di nuovo progetto.
From a solar park in Italy to a hydro power plant in Scotland: challenges can lead to interesting outcomes and generate new ideas. I’m open-minded for any new type of project.
meet Federico