PV Power Plant Serenissima, Italy

Technical Due Diligence, Construction Monitoring and Technical Controlling for a 48 MWp PV Power Plant

The objectives of the assignment were:

  • Identification of technical risks and development of measures for limitation and mitigation of risks
  • Assessment on the ability to complete project on time and on budget
  • Assessment on technical performance level and ability to sustain it over entire economic life
  • Management of technical acceptance including acceptance testing
  • Technical controlling

The scope of work covered the following aspects:

  • Determination of expected annual energy yield
  • Review of licenses and permits
  • Technical design review
  • Review of grid connection
  • Support in negotiation of project contracts
  • Construction monitoring
  • Verification of production numbers
  • Regular inspections of power plant (semi-annual)
  • Consultancy in repair and budget questions
  • Assistance in warranty and insurance claims
  • Support in operational and economical improvements
  • Regular reporting to owners/banks

Technical Due Diligence, Construction Monitoring and Technical Controlling for a 48 MWp PV Power Plant

Country

Italy

Year of Mandate

2011

Year of Commisioning

2011

Key Technical Data

  • Total capacity: 48 MWp
  • PV technology: poly crystalline
  • Inverter manufacturer: KACO new energy
  • Grid connection: 132 kV substation
Evergy Engineering GmbH » Serenissima
Stefano Tadini handyman, working @evergy since 2009
Serenissima è un progetto di riferimento per me. È uno dei più grandi impianti fotovoltaici in Italia: 48 MW. Lo seguo dalla nascita (2010); ci sono sempre nuove sfide che richiedono soluzioni creative.
Serenissima is a real flagship project for me. With 48 megawatts, it’s one of the biggest PV projects in Italy. I’ve been working on it since the beginning (2010); there are always new challenges requiring creative solutions.
meet Stefano

filter
cases
by
download
track
record