Wind Farm
Demircili

Evergy was mandated to carry out a technical audit of the Demircili Wind Farm as part of a certification process.

The wind farm is located on the Çeşme peninsula near Izmir, approximately 2 km from the coastline in western Turkey. It comprises 16 turbines of type Nordex N100 and N90, commissioned in 2016. The facility is connected to the grid via an overhead line constructed by Nordex, which links to the Urla II transformer substation.

The services of Evergy comprised in particular:

  • Design review of the wind farm layout
  • Review of site specific load assessments and determination of the technical life time
  • Technical evaluation of the turbine types
  • Assessment of turbine suitability under local ambient conditions
  • Review of operation contracts
  • Assessment of turbine suitability under local ambient conditions
  • Analysis of operational performance data

Country

Turkey

Year of Mandate

2022

Key Technical Data

  • 16 wind turbines type Nordex N100 / N90

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Demircili
Tobias Moser mountain biker, working @evergy since 2011
Sonne und Wind: Kostenlos. Es ist ein schönes Gefühl zu wissen, dass ich mitarbeite, beides nutzbar zu machen.
Sun and wind are free to all. It feels great to know that I'm one of the people working to harness both of them.
meet Tobias