Hydropower Plant
Lucchio

Evergy was appointed to conduct a comprehensive Technical Due Diligence for the acquisition of an operational hydroelectric power plant located in Tuscany, Italy. The plant has been in operation since 2008.

The Lucchio power plant is a run-of-river facility with a gross head of 68 meters. It is equipped with two Francis turbines, each with a nominal capacity of 3,600 kW, and is connected to the medium-voltage grid of the local distribution network operator.

The services of Evergy comprised in particular:

  • Verification of catchment area characteristics and flow rate assessments
  • Energy yield estimation based on historical operational data
  • Review of existing technical design and system layout
  • Site inspection and evaluation of the plant’s current technical condition
  • Development of a refurbishment plan with associated cost estimates
  • Review of existing Operation & Maintenance (O&M) contracts

Country

Italy

Year of Mandate

2024

Key Technical Data

  • 7.2 MW run-of-river hydroelectric power plant

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Lucchio
Joshua Schwall backpacker, working @evergy since 2015
Ich bin direkt nach dem Studium zu Evergy gegangen. Dabei wurde ich sehr gut betreut und gefördert. Hier habe ich das Gefühl etwas Sinnvolles zu tun. Ich erinnere mich noch an eine Inspektionsreise nach Portugal: In der Mitte des Projektareals war ein Wasserlauf, den wir nur mit dem Geländewagen überqueren konnten und ein kleines, verlassenes Dorf, das erhalten wurde. Das war schon ungewöhnlich.
I joined Evergy straight after my studies. I received very good support and encouragement. I have the feeling that I am doing something meaningful here. I still remember an inspection trip to Portugal: in the middle of the project area was a creek that we could only cross by off-road vehicle and a small, deserted village which was preserved. That was quite unusual.
meet Joshua