Hydropower Plants
Tikraft

Evergy was commissioned to perform a Confirmatory Technical Due Diligence of five operational hydroelectric power plant schemes across Norway.

The run-of-river plants are geographically distributed between Oslo in the south and Tromsø in the north. Commissioned between November 2011 and December 2015, the plants range in nominal capacity from 1.3 MW to 5.5 MW each. All installations are connected at the medium-voltage level to the respective local distribution networks.

The services of Evergy comprised in particular:

  • Verification of the specific catchment area and hydrological flow assessments
  • Energy yield assessment based on operational data
  • Identification of technical issues affecting operational performance
  • Structural integrity verification of the power plant infrastructure
  • On-site inspection and evaluation of current technical condition
  • Preparation of a refurbishment strategy with estimated cost implications

Country

Norway

Year of Mandate

2022

Key Technical Data

  • Portfolio of 5 run-of-river hydroelectric plants with approx. 16 MW total installed capacity

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Tikraft
Rihab Benlyas tea lover, working @evergy since 2021
Chaque projet vient avec son lot de défis. J'ai travaillé sur l'analyse des données opérationnelles de plusieurs centaines de centrales photovoltaïques réparties dans 9 pays. Cette tâche m'a donné un aperçu de la technologie, des contraintes géographiques et de la qualité de la maintenance - tout cela sans mettre un pied à l'intérieur des centrales.
Every project comes with its challenges. I have worked on the Operational Data Analysis of several hundred PV plants spread over 9 countries. This task gave me insight on the technology, geography constraints and quality of maintenance - all without taking a single “physical” step inside the plants.
meet Rihab