PV Power Plant Ourika, Portugal

Technical Due Diligence for a 46 MWp PV Power Plant

The objectives of the assignment were:

  • Identification of technical risks and development of measures for limitation and mitigation of risks
  • Review of the status of relevant licences and permits required for the construction and operation of the project
  • Review of electric grid requirements and check of the compliance of the power plant
  • Inspection of the power plant

The scope of work covered the following aspects:

  • Evaluation of expected annual energy yield
  • Review of licenses and permits
  • Technical design review
  • Review of grid connection
  • Support in negotiation of project contracts
  • Inspection of power plant

Technical Due Diligence for a 46 MWp PV Power Plant

Country

Portugal

Year of Mandate

2018

Year of Commisioning

2018

Key Technical Data

  • Total capacity: 46 MWp
  • PV technology: poly crystalline
  • Inverter manufacturer: Power Electronics
  • Grid connection: 150 kV substation