Technical Due Diligence for a 52 MWp PV Power Plant with Energy Sorage System

The objectives of the assignment were:

  • Identification of technical risks and development of measures for limitation and mitigation of risks
  • Review of the status of all authorisations, licences and permits required for the construction and operation of the project
  • Review of characteristics of the electric grid and analysis of dispatching risks
  • Check of the power plant’s compliance with electrical installation standards

The scope of work covered the following aspects:

  • Determination of expected annual energy yield
  • Review of licenses and permits
  • Site suitability assessment
  • Technical design review
  • Review of grid connection
  • Support in negotiation of project contracts

Technical Due Diligence for a 52 MWp PV Power Plant with Energy Sorage System

Country

Puerto Rico

Year of Mandate

2016

Year of Commisioning

2017

Key Technical Data

  • Total capacity: 52 MWp
  • PV technology: poly crystalline
  • Inverter manufacturer: Schneider Electric
  • Energy storage system: Saft Intensium Max
  • Grid connection: 115 kV substation