BESS Project
Apeldoorn

Evergy was mandated to conduct Technical Due Diligence for a Battery Energy Storage System (BESS) project under development in Apeldoorn, The Netherlands.

The BESS was planned to be installed at the border of the city of Apeldoorn, on the site of an existing solar PV plant that has been operational for two years. To accommodate the BESS, a small section of the PV installation is to be dismantled. At the time of the mandate, both the building permit and grid connection agreement were already in place. The BESS was expected to connect at the same medium-voltage interconnection point used by the existing PV plant.

The services of Evergy comprised in particular:

  • Verification of the technical concept
  • Review of technical design
  • Assessment of permitting status
  • Review of existing grid connection contract and required amendment for the BESS

Country

Netherlands

Year of Mandate

2023

Key Technical Data

  • 15 MW / 30 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Appeldorn
Pierre Dutilleux sailor, working @evergy since 2010
Le déroulement d’un projet est captivant : il arrive que, dès les premières investigations, on flaire certains problèmes qui par la suite se révèleront critiques et pour lesquels, en définitive, une solution devra être trouvée.
It's exciting to follow the development of a project: The initial project analysis often gives you a sense of potential problems that then really do become acute and need to be solved.
meet Pierre
Explore more Energy Storage projects