Wind Farm
Eifel

Evergy was engaged to provide technical advisory for the transaction of the Eifel Wind Farm, which formed part of a larger asset portfolio. Since then, Evergy has continued to deliver ongoing technical consultancy services for the project.

The Eifel Wind Farm was constructed in three phases between 2005 and 2007, incorporating wind turbines from Nordex and Enercon. The turbines are connected to a private transformer substation operating at 110 kV.

The services of Evergy comprised in particular:

  • Technical Due Diligence for the operational asset at the time of transaction
  • Ongoing energy yield assessments based on production data
  • Performance evaluation and technical availability analysis
  • Assessment of turbine retrofit options and technical enhancements
  • Ongoing consultancy on operational and regulatory aspects
  • Regular reporting of key technical and financial indicators
  • Technical advisory on extension and renegotiation of operational project contracts

Country

Germany

Year of Mandate

2011

Key Technical Data

  • 23 wind turbines (Nordex S70/S77 and Enercon E-70)

Services

Energy Forecasts

Optimisation of Existing Projects

Technical Due Diligence

Evergy Engineering GmbH » Eifel
Tobias Moser mountain biker, working @evergy since 2011
Sonne und Wind: Kostenlos. Es ist ein schönes Gefühl zu wissen, dass ich mitarbeite, beides nutzbar zu machen.
Sun and wind are free to all. It feels great to know that I'm one of the people working to harness both of them.
meet Tobias