Wind Farm Kastorf, Germany

Technical Due Diligence and Technical Controlling for a 15.4 MW Wind Farm

The objectives of the assignment were:

  • to determine and quantify the technical risks and to develop measures for limitation and mitigation of those risks
  • to collect and analyze the information necessary to assess the technical performance of the project and to sustain over its economic life certain performance levels and
  • to conduct technical controlling for the wind farm

The scope of work covered the following aspects:

  • Determination of expected annual energy yield
  • Site suitability assessment
  • Review of licenses and permits
  • Technical design review
  • Review of grid connection
  • Support in negotiaton of project contracts
  • Technical controlling during operation

Technical Due Diligence and Technical Controlling for a 15.4 MW Wind Farm

Country

Germany

Year of Mandate

2013

Year of Commisioning

2014

Key Technical Data

  • Total capactiy: 15.4 MW
  • Wind turbines: Vestas V112
  • Grid connection: 110 kV substation