The objectives of the assignment were:
- to determine and quantify the technical risks and to develop measures for limitation and mitigation of those risks
- to collect and analyze the information necessary to assess the technical performance of the project and to sustain over its economic life certain performance levels and
- to conduct technical controlling for the wind farm
The scope of work covered the following aspects:
- Determination of expected annual energy yield
- Site suitability assessment
- Review of licenses and permits
- Technical design review
- Review of grid connection
- Support in negotiaton of project contracts
- Technical controlling during operation