Evergy was mandated to conduct Technical Due Diligence for the acquisition of a large-scale Battery Energy Storage System (BESS) project in Alfeld, Lower Saxony, Germany.

The project is situated near an existing high-voltage substation operated by the local DNO, Avacon, and is located on repurposed agricultural land. The system comprises 72 battery containers equipped with inverters and 36 medium-voltage transformers. Grid connection is facilitated via a project-owned high-voltage transformer station, linking to the DNO’s 110 kV switching station. At the time of the mandate, all necessary permits and grid capacity had been secured. However, the technical design was still being finalized, and contractual negotiations were ongoing.

The services of Evergy comprised in particular:

  • Analysis of site specific characteristics and evaluation of planning and environmental constraints
  • Review of grid connection status and associated infrastructure
  • Assessment of BESS operational strategies and impact on revenue streams
  • Verification of key technical inputs for financial modelling
  • Contractual review of EPC, O&M, and HV substation agreements
  • Evaluation of battery warranties and technical specifications of battery containers

Country

Germany

Year of Mandate

2023

Key Technical Data

  • 138 MW / 285 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Alfeld
Joshua Schwall backpacker, working @evergy since 2015
Ich bin direkt nach dem Studium zu Evergy gegangen. Dabei wurde ich sehr gut betreut und gefördert. Hier habe ich das Gefühl etwas Sinnvolles zu tun. Ich erinnere mich noch an eine Inspektionsreise nach Portugal: In der Mitte des Projektareals war ein Wasserlauf, den wir nur mit dem Geländewagen überqueren konnten und ein kleines, verlassenes Dorf, das erhalten wurde. Das war schon ungewöhnlich.
I joined Evergy straight after my studies. I received very good support and encouragement. I have the feeling that I am doing something meaningful here. I still remember an inspection trip to Portugal: in the middle of the project area was a creek that we could only cross by off-road vehicle and a small, deserted village which was preserved. That was quite unusual.
meet Joshua
Explore more Energy Storage projects