BESS Project
Apeldoorn

Evergy was mandated to conduct Technical Due Diligence for a Battery Energy Storage System (BESS) project under development in Apeldoorn, The Netherlands.

The BESS was planned to be installed at the border of the city of Apeldoorn, on the site of an existing solar PV plant that has been operational for two years. To accommodate the BESS, a small section of the PV installation is to be dismantled. At the time of the mandate, both the building permit and grid connection agreement were already in place. The BESS was expected to connect at the same medium-voltage interconnection point used by the existing PV plant.

The services of Evergy comprised in particular:

  • Verification of the technical concept
  • Review of technical design
  • Assessment of permitting status
  • Review of existing grid connection contract and required amendment for the BESS

Country

Netherlands

Year of Mandate

2023

Key Technical Data

  • 15 MW / 30 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Appeldorn
Muhannad Zorba explorer, working @evergy since 2025
من أكثر الجوانب التي أستمتع بها في عملي زيارة مواقع محطات الطاقة وفحصها. خلال هذه الزيارات أُتيح لي الاطلاع على محطات قديمة وحديثة، مما يتيح مقارنة التطور المذهل في هذا المجال. كما أن السفر إلى أماكن وقرى جميلة لم أكن لأزورها لولا هذه المشاريع يجعل التجربة أكثر تميزاً ومتعة.
من المُلهم بالنسبة لي أن أكون جزءاً من الجهود التي تسهم، ولو بشكل بسيط، في التحول نحو الطاقة المستدامة
One of the things I enjoy most is visiting energy sites—seeing both old and new power plants, witnessing the impressive progress, and discovering beautiful places I might never have visited otherwise. It’s inspiring to contribute, even in a small way, to the transition toward sustainable energy.