BESS Project
Tiln

Evergy was mandated to carry out Technical Due Diligence for the acquisition of the Tiln Battery Energy Storage System (BESS) project in the United Kingdom.

Located approximately 35 km east of Sheffield near Retford, the free-field Tiln BESS project was installed adjacent to an operational solar PV plant. The battery storage system consists of total 26 cabinets sorted into four blocks. The bigger blocks have an export/import capacity of 8.78 MW (2 x 4.39 MW), whereas the smaller blocks have a capacity of 4.39 MW. The system is connected to the grid at 132 kV voltage level. The BESS was commissioned in August 2024.

The services of Evergy comprised in particular:

  • Evaluation of the technical concept and design
  • Review of project contracts (EPC, O&M, transformer station)
  • Evaluation of warranty conditions by the battery supplier
  • Review of technical specifications of the battery system
  • Evaluation of the techno-economic operation scheme with focus on technical input parameters

Country

United Kingdom

Year of Mandate

2023

Key Technical Data

  • 25 MW / 50 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Tiln
Muhannad Zorba explorer, working @evergy since 2025
من أكثر الجوانب التي أستمتع بها في عملي زيارة مواقع محطات الطاقة وفحصها. خلال هذه الزيارات أُتيح لي الاطلاع على محطات قديمة وحديثة، مما يتيح مقارنة التطور المذهل في هذا المجال. كما أن السفر إلى أماكن وقرى جميلة لم أكن لأزورها لولا هذه المشاريع يجعل التجربة أكثر تميزاً ومتعة.
من المُلهم بالنسبة لي أن أكون جزءاً من الجهود التي تسهم، ولو بشكل بسيط، في التحول نحو الطاقة المستدامة
One of the things I enjoy most is visiting energy sites—seeing both old and new power plants, witnessing the impressive progress, and discovering beautiful places I might never have visited otherwise. It’s inspiring to contribute, even in a small way, to the transition toward sustainable energy.
meet Muhannad
Explore more Energy Storage projects