PV Power Plant Pennycae, UK

Technical Due Diligence and Technical Inspection for a 5 MWp PV Power Plant

The objectives of the assignment were:

  • Identification of technical risks and development of measures for limitation and mitigation of risks
  • Review of the status of relevant licences and permits required for the construction and operation of the project
  • Review of electric grid requirements and check of the compliance of the power plant
  • Inspection of the power plant

The scope of work covered the following aspects:

  • Evaluation of expected annual energy yield
  • Review of licenses and permits
  • Technical design review
  • Review of grid connection
  • Support in negotiation of project contracts
  • Inspection of power plant

Technical Due Diligence and Technical Inspection for a 5 MWp PV Power Plant

Country

UK

Year of Mandate

2015

Year of Commisioning

2016

Key Technical Data

  • Total capacity: 5 MWp
  • PV technology: poly crystalline
  • Inverter manufacturer: SMA Solar Technology
  • Grid connection: 11 kV substation

filter
cases
by
download
track
record