Derrydarroch and Upper Falloch

Evergy was appointed to carry out Technical Due Diligence in support of the acquisition process of two operational hydroelectric power plants in Scotland. Both plants have been in operation since 2015.

The Derrydarroch and Upper Falloch facilities are run-of-river systems located within the same hydrological catchment area, with gross heads ranging from 120 m to 213 m. The installed capacities are 0.9 MW and 2.0 MW respectively. Both plants are connected to the local medium-voltage distribution grid.

The services of Evergy comprised in particular:

  • Verification of the specific catchment area and flow rate assessment
  • Energy yield assessment using operational data
  • Technical design review
  • Site inspection and assessment of the current technical condition
  • Development of a refurbishment strategy with associated cost estimation
  • Review of existing Operation & Maintenance (O&M) contracts

Country

United Kingdom

Year of Mandate

2021

Key Technical Data

  • 2 run-of-river hydroelectric power plants, approx. 3 MW combined capacity

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Derrydarroch and Upper Falloch
Stefano Tadini handyman, working @evergy since 2009
Cabrera und Talayuela sind meine neuen Leuchtturmprojekte. Sie sind einfach riesig. Die flache Hierarchie und das internationale Umfeld gefallen mir am meisten. Evergy bedeutet für mich auch nach 15 Jahren Neues zu lernen.
Cabrera and Talayuela are my new flagship projects. They are simply huge. I like the flat hierarchy and the international environment the most. For me, Evergy means learning new things even after 15 years.
meet Stefano
Explore more Hydro projects