Hydropower Plant
Lucchio

Evergy was appointed to conduct a comprehensive Technical Due Diligence for the acquisition of an operational hydroelectric power plant located in Tuscany, Italy. The plant has been in operation since 2008.

The Lucchio power plant is a run-of-river facility with a gross head of 68 meters. It is equipped with two Francis turbines, each with a nominal capacity of 3,600 kW, and is connected to the medium-voltage grid of the local distribution network operator.

The services of Evergy comprised in particular:

  • Verification of catchment area characteristics and flow rate assessments
  • Energy yield estimation based on historical operational data
  • Review of existing technical design and system layout
  • Site inspection and evaluation of the plant’s current technical condition
  • Development of a refurbishment plan with associated cost estimates
  • Review of existing Operation & Maintenance (O&M) contracts

Country

Italy

Year of Mandate

2024

Key Technical Data

  • 7.2 MW run-of-river hydroelectric power plant

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Lucchio
Rihab Benlyas tea lover, working @evergy since 2021
Après avoir travaillé dans un laboratoire de recherche pendant quelques années, j'ai voulu m'impliquer dans le secteur des énergies renouvelables à une échelle plus concrète. Aujourd'hui, je suis fière d'aider au développement, à la construction et à l'exploitation de projets d'énergies renouvelables, en tant que consultante.
After working in a laboratory for some years, I wanted to be involved in the field of renewable energies on a more tangible scale. Now, I am proud to assist with the development, construction, and operation of renewable energy projects, from a technical consultant’s point of view.
meet Rihab