Hydropower Plants
Tikraft

Evergy was commissioned to perform a Confirmatory Technical Due Diligence of five operational hydroelectric power plant schemes across Norway.

The run-of-river plants are geographically distributed between Oslo in the south and Tromsø in the north. Commissioned between November 2011 and December 2015, the plants range in nominal capacity from 1.3 MW to 5.5 MW each. All installations are connected at the medium-voltage level to the respective local distribution networks.

The services of Evergy comprised in particular:

  • Verification of the specific catchment area and hydrological flow assessments
  • Energy yield assessment based on operational data
  • Identification of technical issues affecting operational performance
  • Structural integrity verification of the power plant infrastructure
  • On-site inspection and evaluation of current technical condition
  • Preparation of a refurbishment strategy with estimated cost implications

Country

Norway

Year of Mandate

2022

Key Technical Data

  • Portfolio of 5 run-of-river hydroelectric plants with approx. 16 MW total installed capacity

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Tikraft
Dirk Zeyringer Walker, working @evergy since 2007
Ein Projekt an dem ich gerne mitgewirkt habe, ist der Solarpark Gamma in Rumänien. Es war für das Land eines der ersten großen Solarkraftwerke, welches an das Hochspannungsnetz angeschlossen wurde.
One project I really enjoyed working on was the Gamma solar park in Romania. It was one of the first really big solar parks to be connected to the high voltage power grid in the country.
meet Dirk